Skip to main content
Introducing VisiLean Planner

Construction Planning,Finally modernised.

Full CPM engine. Real-time collaboration. Browser-native.
The scheduling tool construction teams actually want to use.

Contact Support

VisiLean trusted by leading construction companies

ModernModernconstructionconstructionneedsneedsmodernmodernplanning.planning.BuiltBuiltbrowser-native.browser-native.SyncedSyncedininrealrealtime.time.ReadyReadythethemomentmomentyouryourteamteamisis——whereverwhereverthetheworkworkhappens.happens.

Planner Features

Built for the way modern teams plan.

Every tool you'd expect from a desktop planner — re-imagined for the browser, the cloud, and your whole team.

Schedule Health Check
Multiple Calendar Support
Sync with VisiLean
Handles 30K tasks
Import / Export operability
How It Works

Four steps. Zero spreadsheets.

From master schedule to weekly commitment — on one platform.

Step 1

Plan

Drag activities onto the zoomable Gantt. Set dependencies, durations, predecessors, and resource loading. Import P6, MSP, or Asta files in minutes — no desktop install required.

Step 2

See impact

Move a single task and watch the ripple in real time. Dependencies recalculate, downstream activities shift, and the critical path updates — before you commit a single change.

Step 3

Scheduled

Critical activities flag in red the moment they slip. Spot the bottleneck, recover the float, and review the new schedule with your team before it goes out.

Step 4

Sync with VisiLean Gantt

Approve the changes. New project end date, total activities moved, critical-path updates — all summarised. Push the rescheduled plan to the live VisiLean Gantt in one click.

Capabilities

Everything you need. Nothing you don't.

A full CPM scheduling engine in the browser — no install, no handoff, no compromises.

Task Scheduling

Define durations, dates, milestones, and task types with full calendar support and constraint management.

Dependency Logic

All four relationship types — FS, SS, FF, SF — with lag and lead time support for complex networks.

Constraint Engine

SNET, FNLT, Must Start/Finish, ASAP/ALAP — full scheduling rule control across all task types.

Calendar Management

Global and task-specific calendars with holidays, exceptions, and customisable work hour definitions.

CPM Calculation

Critical path identification, forward/backward pass, float analysis, and dynamic auto-scheduling.

WBS Hierarchy

Parent-child task structures with dependency propagation and WBS numbering across hierarchy levels.

Gantt Interaction

Drag-and-drop task bars, inline date editing, adjustable timescales, and live progress bar updates.

Navigation & Search

Multi-select, filtering, sorting, keyboard shortcuts, and free text search across all task fields.

Import & Export

Native MPP, XER, XML, CSV, XLSX support — structure, relationships, and scheduling logic preserved.

Comparison

How it compares.

See why modern construction teams choose VisiLean Planner over legacy desktop tools.

FeatureVisiLean PlannerBest for modern teamsPrimavera P6MS ProjectAsta Power Project
Browser-nativeFull support———
Real-time collaborationFull support—~—
Full CPM engineFull supportFull supportFull supportFull support
Lean / Last Planner integrationFull support~—~
Bidirectional execution syncFull support———
Modern drag-and-drop UXFull support—~~
No desktop install requiredFull support———
Import/Export (MPP, XER, XML)Full supportFull support~~
Full support~Partial / limited—Not supported
Use Cases

Two ways to start.

Whether you're replacing legacy tools or working alongside them, VisiLean Planner fits your workflow.

01

Replace Legacy Planning

For teams ready to leave Primavera P6, Microsoft Project or Asta Power Project behind. A modern, browser-native planning tool that covers the scheduling workloads you actually run.

  • Small and mid-size contractors
  • Teams seeking faster onboarding
  • Firms eliminating legacy licence costs
  • Projects needing collaborative scheduling
02

Complement Existing Tools

For organisations contractually tied to Primavera P6, Microsoft Project or Asta Power Project, but looking for a better day-to-day working planner that reduces friction without requiring a full platform switch.

  • Enterprise contractors with mandated P6 or Asta
  • Owner organisations and PMO teams
  • Firms wanting a modern working layer
  • Projects importing/exporting XER, MPP or PP regularly

Testimonials

Why construction teams switched to VisiLean

Planners, BIM leads, and directors share what changed after making the move.

Capterra

“The Future of Built Environment. VisiLean brings 3D BIM, 4D Simulation, and value stream mapping together in one platform. It is genuinely the future of how we will plan and deliver construction projects.”

Bhaumik P.

Capterra Review

Capterra

“VisiLean bridged the gap between what we planned in the office and what happened on site. That visibility changed everything.”

Digital Construction Lead

Implenia

Capterra

“We reduced our planning cycle from 2 weeks to 3 days. The collaborative planning board changed how our teams communicate on site.”

Senior Project Manager

Goldbeck

Capterra

“A game changer for real estate projects. The experience with VisiLean has been very satisfactory. It simplifies complex planning and gives us real-time control over every aspect of the project.”

Agastya M.

Capterra Review

Capterra

“The Future of Built Environment. VisiLean brings 3D BIM, 4D Simulation, and value stream mapping together in one platform. It is genuinely the future of how we will plan and deliver construction projects.”

Bhaumik P.

Capterra Review

Capterra

“VisiLean bridged the gap between what we planned in the office and what happened on site. That visibility changed everything.”

Digital Construction Lead

Implenia

Capterra

“We reduced our planning cycle from 2 weeks to 3 days. The collaborative planning board changed how our teams communicate on site.”

Senior Project Manager

Goldbeck

Capterra

“A game changer for real estate projects. The experience with VisiLean has been very satisfactory. It simplifies complex planning and gives us real-time control over every aspect of the project.”

Agastya M.

Capterra Review

Planner

Take control of your construction schedule.

Replace P6, MSP, and Asta with a browser-native planner your whole team will actually use. 14-day free trial.