UK Construction Management Software
Build Smart, Build Better
Construction Planning and Management Software for UK Contractors
VisiLean keeps the plan and the site in sync, in real time. Integrated CPM scheduling, Last Planner® commitments, Takt control and live 4D BIM, used by contractors across the United Kingdom.
Reduction in Defects
Improvement in Programme Efficiency
Reduction in Labour Spend
Source: Mace, Clonee data centre case study.
The VisiLean Advantage
The VisiLean Advantage in Construction Delivery
Field App
Update task progress from the field with the LiveSite mobile app.
Real-time Dashboards in Power-BI
Customised Power BI dashboards for performance review and project controls.
Digital Site Diary
Automated Daily Progress Reports delivered straight to your inbox.
Geo-Enabled
Visualise tasks and progress on the map for complex linear infra projects.
Enhanced Design Coordination
Manage and compare every version of design on 4D BIM models.
Checklist for QC and Safety
Dynamic checklists for Quality and Safety inspections with photo evidence.
Interactive Gantt Charts with Critical Path Methodology
Import plans from Primavera® P6, MSP, Asta Powerproject® and CSV, and export files created on the platform.
- Create schedules from scratch on the platform and define your preferred relationships, and hierarchies.
- Set Baselines as a reference to compare the Planned vs Actual progress status with the project timeline.
- Review your critical activities live to gauge the impact of alterations and make informed decisions with the stakeholders.
Benefits
- Single platform for integrated scheduling.
- Complete review of baseline vs planned vs actuals.
- Assess the impact on your project in real-time.
Collaborative Planning Built on Last Planner® System (LPS)
Review your lookahead plans, map constraints, and monitor commitments in real-time.
- Review the upcoming activities against locations, as well as trades, to review work front and resource clashes.
- Ensure work readiness by preparing activities for the upcoming week and monitoring their execution in real-time.
- Click of a button switch between planned and actual review, progress status and package colours.
Benefits
- Clarity in workflow before executing the work onsite.
- Visually driven for enhanced collaboration.
- Track commitments in real-time for continuous improvement.
Efficient Takt Planning & Control Solution
Collaboratively build Takt plans from scratch by importing drawings and defining Takt Zones.
- Define rhythmic movement of trades bundled together in Wagons across Zones.
- Anticipate material needs in advance and align deliveries with the Takt schedule.
- Design, store, and implement the sequences of Takt tasks to streamline and automate your processes.
Benefits
- Refined project strategies with data-driven decisions for project control.
- Streamlined coordination of trades, tasks, materials, and resources.
- Improved communication and collaboration for all stakeholders.
Table View: Excel-style Planning, Built for Construction
Create, save and reuse dedicated configs for your project needs.
- Track project details and reasons for changes for greater accountability.
- Extract lookaheads and Weekly Work Plan (WWP) of each sub-contractor for submissions.
- Export PDF or CSV with tailored data for further analysis.
Benefits
- Customised Configurations, the way you like.
- Interactive and Quick.
- Easy Project Review.
Live 4D BIM Integration
Visualise the project status with trade colours, task status, and potential bottlenecks in a live 4D BIM environment.
- Review the flow of trades across the various BIM model elements in your lookahead view.
- Compare the planned vs actual status on the 4D BIM Model as the updates come from site.
- Conduct constructability reviews through saved sets and filters for proactive decision making.
Benefits
- Visualise construction sequencing.
- Version control to review design changes.
- Visually compare progress.
How It Works
From import to insight in three steps
Whether you start from Primavera P6, MSP, or build from scratch, VisiLean brings CPM, Last Planner® and Takt planning onto one platform.
Typically live on your first project within 2 weeks
Import schedules from Primavera P6, MSP or Asta Powerproject. Create plans from scratch using Interactive Gantt Charts with Critical Path Methodology, then set baselines and define relationships and hierarchies.
“I started at Mace in 2011 in a preconstruction - visualisation role, working mainly in 4D modelling and site logistics planning. I enjoy the fact that every day is different and relish the challenge of building in London based projects where space is limited, and logistics can make or break a project.”
Jon Hurdle
Planning Manager, Mace
FAQ
Frequently Asked Questions
Have a question? We've got answers. If you don't find what you're looking for, feel free to contact us.
Lean project delivery in construction focuses on maximising value and minimising waste through continuous improvement. It involves creating a smooth workflow, identifying bottlenecks, and optimising resource allocation. The end goal is to increase productivity together with profits and innovation in the construction industry.