Deliver Data Centres at the pace your client demands
Coordinate 500+ trades and every commissioning sequence in one live model. Real-time control across the lookahead, the live site, and the carbon report — purpose-built for hyperscale and colo delivery.
Trusted by industry leaders
Challenges & Solutions
Solving Data Centres Construction Challenges
Common obstacles in data centres projects — and how VisiLean helps your team overcome them.
Challenge
Planning disconnected from site reality
VisiLean Solution
Last Planner System with pull-planned weekly commitments
Challenge
Weekly reports surface slip too late
VisiLean Solution
Daily commitment tracking with RNC for every miss
Challenge
Complex MEP coordination
VisiLean Solution
BIM-integrated lookahead and clash resolution
Challenge
Strict commissioning sequences
VisiLean Solution
Digital commissioning workflows on the critical path
Features
Purpose-built for Data Centres construction.
Every feature designed specifically for data centres project delivery — from planning through handover.
Lookahead Planning (Last Planner System)
Pull-planned weekly commitments built from the trades doing the work. Constraint management and Make-Ready workflows resolve issues in the lookahead, not on site. Master schedule (P6 / MSP / Asta) overlay across every hall.
Daily PPC Tracking
Track every commitment, every day. Percent Plan Complete scoring per trade and per hall, Reasons-for-Non-Completion captured for every miss — root cause feeds straight back into next week's plan.
MEP Coordination Hub
Coordinate mechanical, electrical, and plumbing with BIM-integrated planning and clash detection across the full programme.
Commissioning Workflows
Digital commissioning checklists, test documentation, and Tier III/IV sign-off workflows aligned to the critical path.
Power & Cooling Tracking
Track power distribution, cooling systems, and N+1 / 2N redundancy across every hall and pod with live progress overlay.
Real-Time QA/QC
Live quality dashboards, inspection tracking, photo evidence, and defect management — audit-ready for hyperscaler clients.
How It Works
How It Works for Data Centres Projects
From planning to handover — a streamlined workflow built specifically for data centres construction.
Typically live on your first project within 2 weeks
Coordinate MEP design, plan off-site fabrication, and prepare commissioning protocols.
Case Studies
Proven Results in Data Centres
Real projects, measurable outcomes — see how teams use VisiLean on data centres sites.
Mace Group
London, UK
6
Halls
72
MW
+43%
Efficiency
100%
On-Time
“VisiLean stood as the cornerstone for construction efficiency in our Data Centre project.”
Kevin McHugh
Production & Planning Associate Director
Mercury Engineering
Paris, France
24MW
Capacity
-50%
Commissioning
-40%
Clashes
On Target
Budget
“Real-time control and seamless workflow management set new standards for excellence.”
Senior Project Manager
Mercury
GRA
Amsterdam, Netherlands
15k sqm
Area
N+1
Systems
-35%
Defects
2mo early
Delivery
“BIM integration with live 4D visualisation transformed our trade coordination.”
Project Director
GRA
Integrations
Seamless Integration with Your Tech Stack
Connect the tools your team already uses — no data silos, no double entry.
Resources
Resources for Data Centres Professionals
Guides, checklists, and webinars built specifically for data centres construction teams.
Data Centre Construction Planning Guide
Master MEP coordination, commissioning, and handover for mission-critical facilities.
Commissioning Readiness Checklist
Ensure all systems are tested and verified before go-live.
Lean Methods for Data Centre Delivery
How Mace achieved 43% programme efficiency with VisiLean.