Deliver Data Centres at the pace your client demands

Coordinate 500+ trades and every commissioning sequence in one live model. Real-time control across the lookahead, the live site, and the carbon report — purpose-built for hyperscale and colo delivery.

Trusted by industry leaders

Digital RealtyMaceImpleniaGoldbeckMercuryGalliford TryJohn SiskGrahamSMP AllianceCasaisGRA

Challenges & Solutions

Solving Data Centres Construction Challenges

Common obstacles in data centres projects — and how VisiLean helps your team overcome them.

Challenge

Planning disconnected from site reality

VisiLean Solution

Last Planner System with pull-planned weekly commitments

80%+ PPC

Challenge

Weekly reports surface slip too late

VisiLean Solution

Daily commitment tracking with RNC for every miss

24-hr slip visibility

Challenge

Complex MEP coordination

VisiLean Solution

BIM-integrated lookahead and clash resolution

40% fewer clashes

Challenge

Strict commissioning sequences

VisiLean Solution

Digital commissioning workflows on the critical path

50% faster commissioning

Features

Purpose-built for Data Centres construction.

Every feature designed specifically for data centres project delivery — from planning through handover.

Lookahead Planning (Last Planner System)

Pull-planned weekly commitments built from the trades doing the work. Constraint management and Make-Ready workflows resolve issues in the lookahead, not on site. Master schedule (P6 / MSP / Asta) overlay across every hall.

80%+ PPC

Daily PPC Tracking

Track every commitment, every day. Percent Plan Complete scoring per trade and per hall, Reasons-for-Non-Completion captured for every miss — root cause feeds straight back into next week's plan.

24-hr slip visibility

MEP Coordination Hub

Coordinate mechanical, electrical, and plumbing with BIM-integrated planning and clash detection across the full programme.

40% fewer clashes

Commissioning Workflows

Digital commissioning checklists, test documentation, and Tier III/IV sign-off workflows aligned to the critical path.

50% faster commissioning

Power & Cooling Tracking

Track power distribution, cooling systems, and N+1 / 2N redundancy across every hall and pod with live progress overlay.

99.9% uptime ready

Real-Time QA/QC

Live quality dashboards, inspection tracking, photo evidence, and defect management — audit-ready for hyperscaler clients.

30% fewer defects

How It Works

How It Works for Data Centres Projects

From planning to handover — a streamlined workflow built specifically for data centres construction.

Book a Demo

Typically live on your first project within 2 weeks

Coordinate MEP design, plan off-site fabrication, and prepare commissioning protocols.

Case Studies

Proven Results in Data Centres

Real projects, measurable outcomes — see how teams use VisiLean on data centres sites.

Mace Group

London, UK

Hyperscale Data Centre

6

Halls

72

MW

+43%

Efficiency

100%

On-Time

VisiLean stood as the cornerstone for construction efficiency in our Data Centre project.

Kevin McHugh

Production & Planning Associate Director

Mercury Engineering

Paris, France

Edge Data Centre

24MW

Capacity

-50%

Commissioning

-40%

Clashes

On Target

Budget

Real-time control and seamless workflow management set new standards for excellence.

Senior Project Manager

Mercury

GRA

Amsterdam, Netherlands

Colocation Facility

15k sqm

Area

N+1

Systems

-35%

Defects

2mo early

Delivery

BIM integration with live 4D visualisation transformed our trade coordination.

Project Director

GRA

Integrations

Seamless Integration with Your Tech Stack

Connect the tools your team already uses — no data silos, no double entry.

Primavera P6
MS Project
Autodesk ACC
Procore
Asta Powerproject
Power BI
SharePoint
AutoCAD
Revit
Navisworks

Resources

Resources for Data Centres Professionals

Guides, checklists, and webinars built specifically for data centres construction teams.

Guide

Data Centre Construction Planning Guide

Master MEP coordination, commissioning, and handover for mission-critical facilities.

Checklist

Commissioning Readiness Checklist

Ensure all systems are tested and verified before go-live.

Webinar

Lean Methods for Data Centre Delivery

How Mace achieved 43% programme efficiency with VisiLean.