Construction Scheduling Software for India
The Indian construction schedule lives under RERA deadlines, tight subcontractor coordination and a daily reporting cycle that most software still asks project engineers to re-type by hand. VisiLean is a scheduling and production-control platform built for that reality — live CPM schedules with P6, MS Project or Asta imports, automated Daily Progress Reports from the LiveSite mobile app, Last Planner and Takt on top of the master, and a mobile client designed for patchy site connectivity.
What is different about scheduling for Indian projects
Generic scheduling software treats a construction project as a homogenous Gantt. Indian sites have three structural pressures that generic tools ignore:
- •
RERA-driven completion deadlines with penalty exposure
The original registered completion date is the anchor; every slip needs a defensible cause-and-attribution trail to justify an extension. A schedule that is only re-baselined monthly cannot produce that trail cleanly.
- •
Daily Progress Reports (DPRs) as the primary reporting rhythm
Owners, PMCs and lenders expect a DPR every working day. When the site team has to hand-type that report from a WhatsApp thread each evening, the number arrives late, is often stale, and rarely aligns with the master schedule.
- •
Patchy connectivity and mobile-first field teams
Sites in Tier-2 and Tier-3 cities, and much of infrastructure work anywhere, run under intermittent LTE. Software that assumes always-on connectivity produces gaps in the field record.
What VisiLean actually does
Live CPM scheduling
Full CPM engine with P6, MS Project and Asta Powerproject imports. Same forward-pass / backward-pass / float logic your PMC already uses.
Automated DPR generation
Field updates from LiveSite roll into a structured DPR with photos, activities completed, hindrances and resources deployed. Export to your PMC's format.
Last Planner + PPC in the field
Six-week lookahead from the CPM master, weekly commitments captured from site foremen, Percent Plan Complete trended automatically.
Takt planning for high-rise + mixed-use
Rhythm-based scheduling for repetitive floors — turn a 30-storey tower CPM into a Takt board where trades flow through zones week over week.
Live 4D BIM
Play the schedule back against your 3D model with actual progress geometry — planned vs actual as building state, not only bars.
Mobile-first, LTE-tolerant
LiveSite queues offline updates and syncs when connectivity returns. Photos and voice notes compressed on-device for 2G-edge tolerance.
RERA + DPR — the two workflows that matter most
RERA timeline evidence
- Original registered completion date baselined and locked.
- Every schedule variance dated, with a reason code attached (design, materials, weather, permits, subcontractor).
- Extension applications backed by a live, defensible audit trail — not a hand-assembled PDF at the last moment.
DPR automation
- Site engineers update task status from LiveSite; the DPR is a rollup of the day's field entries.
- Photos, activities completed, hindrances, and resources deployed — all in one exported report.
- Export to your PMC / owner-specific PDF template. No re-typing from WhatsApp.
Indian contractors and developers already running VisiLean
The Indian book of business spans residential high-rise, data centres, infrastructure and mixed-use — with named-brand developers who value the RERA-evidence and DPR-automation angles specifically.
Full case studies — browse the case-study library.
Related reading
Critical Path Method (CPM)
The scheduling engine underneath VisiLean — worked example, float analysis and how CPM behaves on Indian sites.
Read moreLast Planner System (LPS)
How weekly commitments and PPC work alongside CPM. The workflow that keeps RERA timelines honest.
Read moreTakt planning
Rhythm-based flow for repetitive floors — the fit for Indian high-rise residential and mixed-use.
Read moreVisiLean Planner
The product page. What the scheduling and production-control platform actually does.
Read moreFrequently asked questions — India
Does VisiLean help with RERA compliance in India?
Yes. VisiLean's live CPM schedule and daily field updates produce the timeline evidence RERA authorities expect — planned versus actual dated against the original programme, delay causes attributed to reason codes, and a defensible audit trail for any extension application. VisiLean does not file RERA submissions for you, but it produces the underlying schedule evidence that most Indian developers assemble by hand today.
Can VisiLean generate DPRs (Daily Progress Reports) automatically?
Yes. When site engineers update task status in the LiveSite mobile app, VisiLean rolls the day's progress into a structured DPR — activities completed, resources deployed, materials received, hindrances logged and photos attached. The report can be exported to a client-specific PDF template or the format your PMC expects, so the office team stops re-typing site data every evening.
Does VisiLean work on Indian sites with poor mobile connectivity?
Yes. LiveSite is designed for patchy LTE — the app queues field updates offline and syncs when connectivity returns. Photos and voice notes are compressed on-device, so a 2G/edge connection is enough to push a completed activity update in under 30 seconds. This is a deliberate design choice; most site teams in India work outside metro coverage more often than in it.
Which Indian contractors and developers use VisiLean?
M3M, Signature Global, Adarsh Developers, Pyramid Infratech, Smart World, Tata Steel and Tata Projects run VisiLean across residential high-rise, data-centre, infrastructure and mixed-use projects. Full case studies are on the Case Studies page.
Does VisiLean support BOQ- and GST-ready reporting formats?
VisiLean's schedule and progress data can be exported to structured formats that plug into your BOQ tracker and GST-invoiced billing workflow. The platform is not itself a billing or GST system — it is the schedule and production-control layer, and it is designed to hand off cleanly to whatever billing / ERP stack you already run.
See VisiLean on an Indian project — pricing in ₹ on demo
Book a 45-minute working demo. Bring a live P6 or MS Project file and we will run your schedule with LPS, Takt and 4D BIM on top — with the DPR rollup wired in.