Skip to main content
Modern data centre facility
Data Centre Construction

Deliver Data Centres
at the pace your client demands

Coordinate 500+ trades and every commissioning sequence in one live model. Real-time control across the lookahead, the live site, and the carbon report — purpose-built for hyperscale and colo delivery.

30%

Reduction in Defects

43%

Improvement in Programme Efficiency

25%

Reduction in Labour Spend

Trusted by leading data centre operators

Digital RealtyMaceMercury
GRA

Data centre programmes live and die by trade coordination at scale. With 500+ trades and 100+ MEP subcontractors converging in tight white-space halls, a single sequencing slip cascades into commissioning delays the client doesn't tolerate.

VisiLean is the planning and tracking platform built for that scale. Start with Last Planner-driven planning — pull-planned weekly commitments, constraints resolved in the lookahead, every trade aligned to the milestone before mobilising. Then track every commitment in real time — daily Percent Plan Complete (PPC) per trade with Reasons-for-Non-Completion captured for every miss, so weekly slip becomes 24-hour visibility.

Drive quality-first delivery through dynamic QC checklists with photo evidence and audit trails. Track carbon emissions in real time across every trade — Scope 3-ready data for hyperscaler ESG reporting and green-bond submissions.

80%+

Percent Plan Complete (PPC)

500+

Trades coordinated per build

43%

Programme efficiency improvement

Integration & Innovation

Purpose-built capabilities for Data Centre complexity

From work preparation and project control to end-to-end sustainability — everything purpose-built for Data Centre delivery.

Planning

Last Planner System — built in

Plan the lookahead the way the Lean playbook intended. Pull-planned commitments, constraints resolved before mobilisation, and a master-schedule overlay every trade works against.

  • Pull-planned Weekly Work Plans built from trade commitments, not from a top-down Gantt
  • Constraint management and Make-Ready workflows release tasks only when actually ready to run
  • Lookahead overlay against P6 / MSP / Asta — drift surfaces before it reaches the site, not in the weekly report
  • Takt planning for repetitive white-space and hall sequences — production flow you can see
Planning

End-to-End Partnership

Your Partner in Every Facet of Data Centre Construction

Lookahead planning with Last Planner System

Pull-plan weekly commitments across 500+ trades and 100+ MEP subcontractors. Constraints resolved in the lookahead, master schedule (P6 / MSP) overlaid against site reality — every trade aligned to the milestone before mobilising.

Daily PPC tracking & RNC

Track every commitment daily. Percent Plan Complete scoring per trade and per hall. Reasons-for-Non-Completion captured for every miss — root-cause feeds back into next week's plan automatically.

MEP / structural coordination

Surface and resolve clashes between MEP, structural, and architectural in the lookahead — before they hit site.

Commissioning critical-path control

Sequence Tier III/IV commissioning workflows alongside trade work. 4D BIM overlay of planned vs actual protects the path that matters most.

Integrations

Plugs into the stack you already run

VisiLean integrates with the planning, BIM, and reporting tools your teams already use — no rip-and-replace.

Autodesk RevitBentley SynchroOracle Primavera P6Microsoft ProjectProcoreOracle AconexAutodesk BuildPower BI
Mace

“VisiLean stood as the cornerstone for construction efficiency, revolutionising processes with real-time control in our Data Centre project. Its pivotal role ensured seamless workflow management and timely progress, setting new standards for excellence.”

Kevin McHugh

Production and Planning Associate Director, Mace