
Design Workflow on VisiLean
We are excited to announce that VisiLean can now tackle design workflows as well, making it a truly integrated production management platform!
14 Apr 2020
Blog
Lean construction, BIM integration, and project management thinking from the VisiLean team.

We are excited to announce that VisiLean can now tackle design workflows as well, making it a truly integrated production management platform!
14 Apr 2020

Covid-19 has created a global chaos. While the construction industry certainly did not need a new challenge, it is undeniably having to deal with one.
30 Mar 2020

Dynamic Gantt in VisiLean: Project Plans on VisiLean are never static. Realtime update from the site using the VisiLean Mobile App.
18 Mar 2020


Planning for construction projects follows a top-down approach, where a milestone plan drives a master schedule to achieve the target completion date.
18 Feb 2020

Discover how VisiLean combines CPM and Last Planner System for better planning, real-time updates, & 45% boost in construction productivity.
23 Jul 2019

VisiLean serves as a comprehensive construction management solution for diverse project types, boosting efficiency and collaboration.
16 Apr 2019

VisiLean is a production management system that supports LEAN and BIM, designed to address challenges in construction projects.
5 Apr 2019

VisiLean’s Construction Project Monitoring Dashboards for tracking, monitoring and reviewing your projects from a single platform.
7 Feb 2019

VisiLean's CEO Dr. Bhargav Dave wrote an article with Olli Seppänen and Uwe Modrich, on integration of Location Based Management System (LBMS) with LPS. As it is widely known, one of the greatest strengths of the location based management system in construction is its ability to tackle spatial nature of construction projects and address the flow in a simple and visual way. This is in contrast with CPM that does not address the flow aspect explicitly and ignores the spatial nature of construction projects. These aspects of LBMS make it a very good candidate for integration with LPS that also emphasises flow.
3 Dec 2018

Hybrid construction combines offsite modules with onsite assembly, ensuring timely delivery & efficient workflows on construction sites.
23 Nov 2018

Top down vs bottom up planning methods are two of the most popular approaches used in the construction industry when it comes to planning.
8 Oct 2018
Page 8 of 9 (98 posts)