The VisiLean Advantage
The VisiLean Advantage in Lean driven Project Delivery
Field App
Update task progress from the field with the LiveSite mobile app.
Real-time Dashboards in Power-BI
Customised Power BI dashboards for performance review and project controls.
Digital Site Diary
Automated Daily Progress Reports delivered straight to your inbox.
Geo-Enabled
Visualise tasks and progress on the map for complex linear infra projects.
Enhanced Design Coordination
Manage and compare every version of design on 4D BIM models.
Checklist for QC and Safety
Dynamic checklists for Quality and Safety inspections with photo evidence.

Interactive Gantt Charts with Critical Path Methodology
Smooth importing of plans from Primavera® P6, Microsoft® Project (MSP), Asta Powerproject® and Vico as well as exporting files created on the platform.
- Single platform for integrated scheduling.
- Complete review of baseline vs planned vs actuals.
- Assess the impact on your project in real-time.
Collaborative Planning Built on Last Planner® System (LPS)
Review your lookahead plans, map constraints, and monitor commitments in real-time.
- Clarity in workflow before executing the work onsite.
- Visually driven for enhanced collaboration.
- Track commitments in real-time for continuous improvement.


Efficient Takt Planning & Control Solution
Collaboratively build Takt plans from scratch by importing drawings and defining Takt Zones.
- Refined project strategies with data-driven decisions for project control.
- Streamlined coordination of trades, tasks, materials, and resources.
- Improved communication and collaboration for all stakeholders.
Table View — Your Microsoft® Excel® Alternative
Create, save and reuse dedicated configs for your project needs.
- Customised Configurations, the way you like.
- Interactive and Quick.
- Instant Project Review.


Live 4D BIM Integration
Visualise the project status with trade colours, task status, and potential bottlenecks in a live 4D BIM environment.
- Visualise construction sequencing.
- Version control to review design changes.
- Visually compare progress.
How It Works
From import to insight in three steps
Whether you start from Primavera P6, MS Project, or build from scratch — VisiLean integrates every planning method on one platform.
Typically live on your first project within 2 weeks
Import schedules from Primavera P6, Microsoft Project, or Asta Powerproject. Create plans from scratch using Interactive Gantt Charts with Critical Path Methodology, then set baselines and define relationships and hierarchies.
“I started at Mace in 2011 in a preconstruction - visualisation role, working mainly in 4D modelling and site logistics planning. I enjoy the fact that every day is different and relish the challenge of building in London based projects where space is limited, and logistics can make or break a project.”
Jon Hurdle
Planning Manager, Mace
FAQ
Frequently Asked Questions
Have a question? We've got answers. If you don't find what you're looking for, feel free to contact us.
Lean project delivery in construction focuses on maximising value and minimising waste through continuous improvement. It involves creating a smooth workflow, identifying bottlenecks, and optimising resource allocation. The end goal is to increase productivity together with profits and innovation in the construction industry.


