Background
Willmott Dixon, a leading UK contractor, adopted VisiLean to reduce planning cycles and improve trade coordination on residential projects across multiple sites.
Challenges
- Planning cycles taking too long with manual processes
- Trade coordination challenges across multiple residential sites
- Need for standardised Last Planner implementation
Solution
Last Planner System: Digital collaborative planning replacing manual methods.
Trade Coordination: Commitment-based scheduling with real-time updates.
Dashboard Analytics: PPC tracking and constraint visibility.
Outcomes & Impact
- 50% reduction in planning cycle time
- Improved trade coordination and commitment reliability
- Standardised Last Planner approach across projects
Key Learnings
- Digital Last Planner accelerates planning cycles significantly
- Commitment-based scheduling improves trade reliability
Download Full Case Study
Fill in your details to download the complete “Willmott Dixon Case Study: Residential Excellence with VisiLean” case study as a PDF.



